SIGNAL FIRE SYSTEMS|PANEL STATUS: ALL ZONES NORMAL|27 FEB 2026 · 20:54
LICENSED · BONDED · NFPA 72 CERTIFIED

We pull cable through ceiling voids, mount strobes to cinderblock, and program panels until every zone reports clean — then we stand beside the inspector until the building is certified.

98.7%
First-pass rate
47K+
Devices installed
38
Jurisdictions
FIRE ALARM CONTROL PANEL — ZONE MAP
NORMAL
FLOOR 4Office SuiteFLOOR 3Patient Rooms+2FLOOR 2Common AreasFLOOR 1Lobby / Egress+7BASEMENTMechanicalZONE 58 DEVICES2 circuits — SUPERVISEDZONE 414 DEVICES3 circuits — SUPERVISEDZONE 311 DEVICES3 circuits — SUPERVISEDZONE 219 DEVICES4 circuits — SUPERVISEDZONE 17 DEVICES2 circuits — SUPERVISEDBUILDING CROSS-SECTION — FIRE ALARM ZONESFACPALL ZONESNORMAL
SUPERVISED
OFFICE
COMMON
EGRESS
MECHANICAL
59 DEVICES TOTAL · 5 ZONES · ALL SUPERVISED
NFPA 72 COMPLIANT
AHJ COORDINATION
NOTIFIER · SILENT KNIGHT · SIMPLEX
FACP PROGRAMMING
98.7% FIRST-PASS RATE
ROUGH-IN TO CERTIFICATE
ASSISTED LIVING · COMMERCIAL · INDUSTRIAL
ZONE SUPERVISION VERIFIED
47,382 DEVICES INSTALLED
NFPA 72 COMPLIANT
AHJ COORDINATION
NOTIFIER · SILENT KNIGHT · SIMPLEX
FACP PROGRAMMING
98.7% FIRST-PASS RATE
ROUGH-IN TO CERTIFICATE
ASSISTED LIVING · COMMERCIAL · INDUSTRIAL
ZONE SUPERVISION VERIFIED
47,382 DEVICES INSTALLED
SYSTEM STATUS — ALL ZONES NORMAL
27 FEB 2026 · 20:54 UTC
0
Devices Installed
Smoke · Heat · Strobe · Pull Station · Duct
LIVE
0
Jurisdictions Served
Active AHJ relationships across 4 states
LIVE
0.0%
First-Pass Inspection Rate
AHJ approval without re-inspection callback
LIVE
0
Systems Commissioned
New construction, retrofit, and replacement
LIVE
INSTALLATION PROCESS

From Permit to Certificate

Five phases. No shortcuts. Every project tracked against code from the first site walk to the inspector's signature.

01

Survey & Code Review

○ PENDING

Walk every square foot with the facility manager — measure occupancy loads, identify existing system deficiencies, and pull the current edition of NFPA 72 against local amendments.

Timeline
1–3 days
Devices
N/A — assessment only
Permit Stage
Pre-permit
Deliverable
Deficiency report + code gap analysis
02

System Design

○ PENDING

Produce stamped shop drawings showing every device location, circuit topology, zone layout, and supervision pathway — submitted to AHJ for plan review before a single drill bit touches drywall.

Timeline
3–7 days
Devices
Device schedule locked
Permit Stage
Plan review submission
Deliverable
Stamped drawings + device schedule
03

Rough-In & Wiring

○ PENDING

Pull FPLR cable through ceiling voids and conduit runs, terminate at junction boxes, and label every homerun back to the panel location — all work inspected before walls close.

Timeline
2–14 days (building size)
Devices
Conduit & cable installed
Permit Stage
Rough-in inspection
Deliverable
Signed rough-in card from inspector
04

Device Installation & Programming

○ PENDING

Mount strobes to cinderblock, snap detectors to bases, hang pull stations at code-required heights, then program the FACP until every zone answers clean and every SLC loop reports normal.

Timeline
1–5 days
Devices
All devices active
Permit Stage
Pre-final walkthrough
Deliverable
Functional test report, all zones green
05

Final Inspection & AHJ Approval

○ PENDING

Stand beside the inspector, activate every initiating device, verify notification appliances reach required dB levels, and walk out with a signed certificate of occupancy — or come back until we do.

Timeline
1 day
Devices
Full system verified
Permit Stage
Certificate of Occupancy
Deliverable
AHJ acceptance letter + as-built drawings
WHO WE SERVE

Built for the Buildings That Can't Wait

Three client profiles. Each one facing a different clock. Signal works all three.

Facility Managers

Assisted Living & Healthcare

Aging systems in occupied buildings where a disruptive false alarm at 3 AM is not a theoretical problem — it already happened last quarter.

THE SITUATION

"Aging panel flagged by state fire marshal. Correction notice in hand."

SIGNAL RESPONSE

We replace or retrofit without displacing residents. Phased work, nighttime pulls, zero-disruption commissioning.

14 facilities · Avg 4.2 zones per floor
General Contractors

New Commercial Construction

You have an occupancy deadline and a fire alarm subcontractor slot on your schedule. Missing that final inspection means your entire CO timeline shifts.

THE SITUATION

"AHJ inspection in 11 days. Previous sub pulled out."

SIGNAL RESPONSE

We mobilize within 72 hours, work from approved drawings or produce them, and show up to the inspection.

98.7% first-pass rate · Avg 6-day mobilization
Portfolio Managers

Property Management

A fire marshal correction notice lands on a 200-unit building you manage. The clock is running, the liability is real, and your current vendor is not returning calls.

THE SITUATION

"Correction notice: 30 days to compliance. Vendor unresponsive."

SIGNAL RESPONSE

Emergency assessment within 48 hours. Written correction plan submitted to the fire marshal within 5 business days.

48-hour emergency response · Correction plans accepted 100%
GET ASSESSED

Get Your Building Assessed

Submit your building details and we'll schedule a site walk within 48 hours. For correction notices with active deadlines, we prioritize same-week response.

WHAT HAPPENS NEXT
24h
Signal technician contacts you to confirm scope and schedule
48h
Site walk with your facility manager or GC superintendent
5 days
Written assessment with device count, code gaps, and cost estimate
CORRECTION NOTICE? CALL DIRECT
(555) 847-2200
Available Mon–Sat, 7 AM–6 PM

No spam. No sales calls. A licensed technician reviews every submission.

Get Your Building Assessed